SOLINK
Get in touch

Manufacturing

Solar, BESS & wheeled energy for South African manufacturers

Multi-shift operations, heavy machinery peaks and rising demand charges make renewable procurement a competitive necessity for South African manufacturers — not an ESG box-tick.

Why it matters

Why manufacturers benefit disproportionately

Manufacturing plants combine the highest kWh consumption and the sharpest demand peaks of any C&I sector in South Africa. Every rand added to the Eskom tariff is felt directly on the bottom line, and a growing share of that increase now falls on the demand component — where solar alone doesn't help. The result is a very high return on integrated solar plus BESS solutions.

Rooftop solar array on a Philippi manufacturing facility with process storage tanks alongside

Heavy demand exposure

Compressors, presses and furnaces drive short, sharp peaks that dominate the demand-charge component of the monthly bill.

Multi-shift consumption

Solar only covers daylight. Manufacturers running 2–3 shifts need BESS or wheeling to cover the evening and night load — that's where wheeled PPAs shine.

Production continuity

Load shedding costs a factory more in lost production than the electricity itself. Right-sized BESS eliminates the shedding penalty entirely for many operations.

Our approach

How SOLINK works with manufacturing clients

SOLINK's methodology starts with the physics of your plant's demand — not with a solar quote. That's what makes the recommendations trustworthy.

  1. STEP 01

    Demand profile decomposition

    We break the site's load into base, process and peak components so BESS is sized against the peaks that actually cost you money — not average load.

  2. STEP 02

    Solar + BESS integration design

    Ratio, technology and dispatch strategy modelled together, not sequentially. Integrated design typically unlocks 20–35% more value than solar-then-BESS.

  3. STEP 03

    Wheeling overlay evaluation

    For manufacturers with load beyond what rooftop can supply, we quantify the incremental case for a wheeled PPA on top of behind-the-meter solar and storage.

Solar installation at the Distell Mthatha production plant, a South African manufacturing facility

Independence matters

Your side of the table, not the EPC's

Solar EPCs are excellent at building solar. They are less excellent at telling a manufacturer when solar is the wrong answer, when BESS should come first, or when a wheeled PPA would deliver more. SOLINK does not sell hardware. Every recommendation is scored on your business case — not on a quota.

Ready to look at your site?

Send us 12 months of electricity bills and a short brief on your operation. We'll come back with an independent view on what solar, BESS or wheeling should look like for your specific site.